Example

Here is a example of the structure of a technical offer for an architectural project. This template is adaptable for public or private tenders, and its level of detail can vary according to the client's requirements or specifications.


TECHNICAL OFFER - ARCHITECTURAL PROJECT

1. Letter of Introduction

  • Brief greetings.
  • Project identification.
  • Commitment to quality and compliance.
  • Signature of the legal or technical representative.

2. Table of Contents


3. Executive Summary

  • Summary of the technical proposal.
  • General approach.
  • Main strengths of the bidding team.

4. Understanding the Project

  • Description of the assignment.
  • General and specific objectives.
  • Problems identified.
  • Scope according to the specifications.

5. Methodological Approach and Design Proposal

  • Architectural principles and criteria.
  • Project phases:
    • Preliminary study
    • Preliminary draft
    • Basic or final project
    • Executive project
  • Relationship with the environment and urban planning regulations.
  • Sustainability strategies (if applicable).
  • Use of BIM or CAD technologies (if applicable).

6. Work Plan

  • General timetable by stages (e.g. Gantt).
  • Key delivery milestones.
  • Supervision and quality control.
  • Coordination with other disciplines (structural, installations, etc.).

7. Task Force

  • Organisational chart of the team.
  • Summarised curricula vitae.
  • Roles and responsibilities.
  • Relevant team experience.

8. Offeror's Experience

  • Similar projects carried out.
  • Previous customers (optional).
  • Awards, recognitions or publications (if applicable).
  • Technical and logistical capacity.

9. Technical and Material Resources

  • Software used (AutoCAD, Revit, etc.).
  • Survey equipment (drones, 3D scanners, etc.).
  • Working protocols and internal control.

10. Quality, Safety and Environment Management

  • Design quality assurance plan.
  • Review and approval protocols.
  • Accessibility considerations, energy efficiency, etc.
  • Commitment to local and international regulations.

11. Annexes

  • Preliminary plans (if required).
  • Certificates, professional licences, etc.
  • Letter of commitment from key personnel.
  • Additional legal documentation (RUT, chamber of commerce, etc.).

    en_GB